Prove the value on your material

Mine-specific testwork validates the UFR against your orebody and circuit, and quantifies the recovery, cost and environmental case before any capital decision.

Why testwork

Generic figures do not de-risk a capital decision

Every orebody and circuit is different. Rather than publish generic percentages, AZTEC establishes the performance of the UFR on your material through onsite testwork.

The results validate the design parameters for your operation and feed the financial modelling used for feasibility and investment analysis, giving a measured basis for the decision rather than an estimate.

What testwork validates

The measures that shape the business case

Gold recovery

Additional gold recoverable from your as-arising tailings discharge, measured against current circuit performance.

Operating cost

Change in detox reagent consumption and the associated OPEX impact for your circuit.

Cyanide reduction

Reduction in free and WAD cyanide concentrations in the treated slurry, supporting ICMI-aligned management.

Process stability

Reactor behaviour across your range of slurry densities and operating conditions.

Design parameters

The engineering inputs needed to configure the UFR circuit for your plant.

Financial model inputs

Measured data to support feasibility and investment analysis.

The high-level process

What to expect

The exact scope is agreed with you and depends on your material and objectives, but the sequence below is how AZTEC normally runs a campaign.

Questionnaire and financial evaluation

You share throughput, tailings grade and operating costs. AZTEC runs a high-level financial assessment against a deliberately conservative assumed recovery of 10 to 15%, to establish whether there is enough economic potential to justify physical testwork.

Onsite pilot campaign

Where the economics are attractive, AZTEC deploys its mobile six-stage 2 L pilot UFR. A typical campaign runs continuously, 24 hours a day, for four to six days, with four AZTEC personnel covering day and night shifts.

Verifiable results

AZTEC works alongside your metallurgical team. Your team collects 25 L of as-arising tailings every three hours using the site's established sampling procedures, and feed and tails composites are collected each shift.

Results and financial modelling

Assays are compiled and used to build the feasibility and investment case for your operation, against your own cost base.

Engineering and integration

If you proceed, custom engineering configures the circuit for optimal integration with your plant.

6

stages

Of the 2 L mobile pilot UFR.

24/7

operation

Continuous through the campaign.

4

personnel

Two day shift, two night shift.

4

crates

The pilot rig ships as checked baggage on a normal airline booking.

Methodology and data integrity

Your laboratory, your ore, mine-specific results

The six-stage two-litre AZTEC pilot UFR rig set up on site, with labelled reactor stages, feed and tails tanks and pump controllers
The mobile six-stage 2 L pilot UFR, set up on site. It ships in four crates as checked baggage.

The recovery improvements the UFR demonstrates can look significant, which is exactly why AZTEC does not ask you to take them on trust. Testwork is run on site, on your material, rather than in a laboratory or on vendor-generated results.

All solid, solution and carbon samples are submitted to the same laboratory your site already uses for routine metal accounting, so the results are generated independently of AZTEC and can be checked against your own reporting.

Request mine-specific testwork

Leave your contact details and we will be in touch to discuss your operation.

Contact details

Include your country code.

Prototype note, removed at build: this form is for visual review only. It is not wired up, sends nothing and stores nothing. Form delivery, recipient addresses and the privacy notice are confirmed before launch. Submitting shows the confirmation state.